
DOSH Regulatory Compliance
SERVICE & SOLUTION
Liaison, Submission & Registration
Design Verification (Steam Boiler, Pressure Vessel & Lifting Machinery)
Workplace Registration
Registration of New Plant Installation
Relocation of Plant
Initial Inspection
Periodical Inspection
CF Renewal - PMT/PMD/PMA
Permit to Install (PTI) & Permit to Operate (PTO) for Steam Boiler, Pressure Vessel, Lifting Machinery, and Piping
PSTT (Pemeriksaan Secara Teknologi Termaju)
SSI (Special Scheme of Inspection)
Used Equipment Reverse Engineering
Repair and Alteration
Essential Fitting Calibration or Functional Test (Pressure Gauge, PSV or PRV)
Occupational Safety and Health Workplace Assessment (OSHWA)
Hazard Identification, Risk Assessment & Risk Control (HIRAC)
Noise Risk Assessment (NRA) - Audiometric assessment & Engineering Control analysis
Chemical Health & Risk Assessment (CHRA) - Local Exhaust Ventilation (LEV) & Chemical Exposure Monitoring (CEM)

